PMB 200/300 Exporters

Export quotations for polymer modified bitumen in the EN 14023 200/300 penetration range

PMB 200/300 specifications identify a very soft nominal penetration range for polymer modified bitumen. Before requesting a quotation, confirm that your project explicitly requires PMB 200/300 and check the complete designation, including the specified softening-point class and any additional performance requirements.

Send us the relevant specification clause for your PMB 200/300 requirement. We will review the stated requirements and confirm what we can offer, including packing, Incoterm, documents and any agreed inspection arrangements.

PMB 200/300 at a Glance

Polymer Modified Bitumen 200/300
Item Detail
Product family Polymer modified bitumen (PMB), typically hot-applied where specified
Classification framework EN 14023, subject to the standard and edition named in the contract
Nominal penetration range 200–300 (0.1 mm) at 25 °C, tested to EN 1426 where applicable
Position in the PMB series A very soft nominal penetration range; confirm the applicable classification framework and designation in the project documents
Complete designation The softening-point class and other classification details required by the applicable specification
Additional properties The characteristics and limits selected by the project specification
Offered designation Stated in full in the quotation and supporting technical documents

Confirming a PMB 200/300 Requirement

Before requesting a quotation, review your project documents carefully. The following checks help ensure that the offer matches the required binder.

  • Confirm the product type. Check that the specification calls for polymer modified bitumen and identifies the applicable standard. An unmodified soft bitumen, bitumen emulsion or cutback bitumen is a different product.
  • Confirm the penetration range. Make sure the stated range matches the requirement in your contract. If the specification refers to a different or softer range, ask the project designer to clarify it rather than assuming equivalence.
  • Check the softening-point class. Review the full designation and confirm which minimum softening-point class the project requires. The range alone may not provide enough information for a complete quotation.
  • List the selected properties. Depending on the specification, requirements may include low-temperature behaviour, Fraass breaking point (EN 12593), elastic recovery (EN 13398), cohesion, storage stability (EN 13399) or resistance to ageing (EN 12607-1). Confirm the applicable test methods and acceptance limits.
  • Record the standard edition. Include the EN 14023 edition and any national standard, annex or supplementary document cited in the contract.

These checks help suppliers compare like-for-like requirements. For more background, read the EN 14023 PMB classification guide.

You can also explore our polymer modified bitumen product range to review related PMB grades.

PMB 200/300 and Neighbouring Grades

Binder you may be offered How it differs Acceptable as PMB 200/300?
PMB 120/200 (EN 14023) A neighbouring nominal penetration range with an endpoint that overlaps numerically at 200 No, not solely on the basis of the overlapping endpoint. Check the full designation and project requirements.
Penetration grade 250/330 An unmodified soft bitumen grade with a nominal penetration range that overlaps numerically with part of 200/300 No. It is a different product classification.
Penetration grade 160/220 An unmodified bitumen grade with a different nominal penetration range No. It is a different product classification.

A penetration test result within a numerical range does not automatically make a binder equivalent to PMB 200/300. The complete designation, product type, and applicable specification determine whether the material meets the requirement.

For unmodified paving grades, see our penetration grade bitumen range. When comparing PMB products, also check the relevant requirements in our PMB category.

Where PMB 200/300 Is Typically Specified

PMB 200/300 should be considered only when the project documents call for this range and define the required performance. Depending on the application, the specification may place particular emphasis on low-temperature behaviour, handling conditions or other selected characteristics.

  • Projects with explicitly defined low-temperature binder requirements.
  • Hot-applied treatments or specialist applications that name this PMB range in the contract.

However, the appropriate binder depends on the pavement or treatment design, service conditions and applicable specification. We prepare export quotations against the designation and requirements provided in your documents.

Quoting PMB 200/300 for Export

For an accurate export quotation, send the complete specification clause, required quantity, destination port, and preferred Incoterm. Also include any application or treatment specification that affects product selection.

If the cargo will face specific storage or handling conditions at destination, share those details with your enquiry. This information helps the supplier assess the requested packing and handling arrangements.

Each quotation should identify the offered designation and applicable standard edition, technical data sheet (TDS), packing, loading port, Incoterm (FOB, CFR or CIF), available documents, agreed inspection scope, price validity and estimated transit time.

Documents and Inspection for PMB 200/300

Review the technical documents against the complete designation. In particular, check these items before approving an offer:

  • Technical data sheet (TDS): Confirm that it names the complete designation, lists each selected characteristic with its test method and acceptance limit, and provides the relevant softening-point, handling-temperature and flash-point information where applicable.
  • Batch certificate of analysis (COA): Check the measured penetration result under EN 1426, softening point under EN 1427, and each selected characteristic. The report should identify the batch so you can match it to the cargo.

For a practical document review, consult the PMB TDS and COA checklist. It explains how to review the information supplied with a binder.

If your contract requires third-party inspection, agree on the scope before shipment. Specify the units to be sampled, sample containers and handling, laboratory, test list and methods. The final inspection report will cover the checks included in that agreed scope. You can also read the PMB testing and quality control guide for more context.

Packing, Shipping and Handling

The packing arrangement for PMB 200/300 should be agreed for each enquiry and stated in the offer. Do not assume that packing used for conventional bitumen is suitable for every PMB formulation or destination.

Compare the TDS with the temperatures expected during transit and storage. If the shipment may experience high temperatures, ask the supplier to confirm that the proposed packing and handling arrangements suit the product.

At the destination, follow the supplier’s technical data sheet and safety data sheet for heating, holding and handling. If you intend to store the binder hot, request written guidance on storage conditions and maximum holding time. Finally, include any destination approval, import documentation, or pre-shipment inspection requirement in your enquiry.

Frequently Asked Questions

Is PMB 200/300 the same as 250/330 bitumen?

No. 250/330 is an unmodified penetration grade, overlapping 200/300 only between 250 and 300. PMB 200/300 is polymer modified and is completed by an EN 14023 softening-point class.

Can PMB 120/200 be supplied instead?

No. PMB 120/200 is a different designation that meets 200/300 only at 200. An alternative is possible only if your specification permits it and equivalence is shown with test data.

My requirement is softer than 200/300. Is there a softer PMB range?

Not among the EN 14023 nominal penetration ranges; 200/300 is the softest. Check which specification and product family the requirement comes from before requesting offers.

What should the COA report for penetration?

The measured value with its test method (EN 1426), not only a statement that it falls within 200–300. The same applies to softening point and every selected characteristic.

What should I check before storing PMB 200/300?

The declared softening point and handling temperatures on the TDS, the expected storage temperatures, and the supplier’s written storage conditions.

Request a PMB 200/300 Quotation

To prepare an accurate offer, send:

  • the complete designation, or the specification clause, with standard and edition;
  • any treatment or application specification that applies;
  • quantity in metric tons and the required delivery window;
  • destination port, Incoterm (FOB, CFR or CIF) and expected storage temperatures;
  • any packing preference;
  • inspection scope and required documents, including destination approvals.

Request a PMB 200/300 Quote

All EN 14023 ranges and the PMB export process: Polymer Modified Bitumen Exporters